From
Ed's HVAC CORP Edvaldo Alves
1011 Concord Rd
Marlborough, MA 01752
US
To
GRS Construction
18 Avondale st
Billerica, MA 01829
Date
April 4, 2025
Estimate Number
1619
Expiration Date
May 4, 2025
Estimate Total
$19,000.00
  1. Task
    Rate
    Qty
    Amount

    • System Type: 5 Ton Hydronic Heating & Cooling system for 2 zones with 2 ducts.
    • Components: Includes hydronic heat pump (or boiler), existing condenser for cooling, and two ducts for proper airflow distribution in both zones.
    • Zone Control: Smart thermostats and automatic dampers for each zone to ensure independent temperature control.
    • Ductwork: Installation of 2 ducts for effective air distribution in both zones, integrating with the hydronic system.
    • Labor: Full installation, including ductwork, testing, and system balancing to ensure optimal performance.
    Bathroom vent

    $19,000
    1
    $19,000
Subtotal $19,000.00
Total $19,000.00

Notes

Thank you; we really appreciate your business.

Status Update
April 4, 2025 @ 7:32 pm

Status changed: Draft to Pending.

Viewed
April 4, 2025 @ 7:32 pm

Estimate viewed by (edshvaccorp@gmail.com) for the first time.

Viewed
April 11, 2025 @ 6:53 pm

Estimate viewed by 72.93.206.126 for the first time.

Viewed
April 22, 2025 @ 8:58 am

Estimate viewed by 172.56.194.10 for the first time.

Updated
April 22, 2025 @ 1:54 pm

Estimate updated by Edvaldo Alves.